Skip to Content Skip to Footer

Mechanical and Electrical upgrade at Student Center 

Engineer and Contractor: Rosser International, Inc.

Estimated Project Cost: $300,000

Construction Dates: Completed Spring 2008

Mechanical upgrade includes air handling units replacement, ductwork, air distribution and variable air volume devices upgrade, installation of an addition to the existing Siemens integrated automated temperature control system, hot/cold water system operating units upgrade. Electrical upgrade includes electrical control devices, electrical distribution equipment, wiring and lighting system upgrade.